欧美日本一线视频,狼友视频少妇向日的日子,欧美猛交ⅹxxx乱大交视频,一级不卡中文字幕精品片

NewsHome > News > Industry dynamics

Secret Record of Maintenance and Maintenance of Grazing Machine
release time:2019-3-28 15:49:00      hit count:2102

Daily pre-start check

1. Check oil and coolant leakage, record tire damage, hose extrusion deformation, bolt loosening or edge wear.

2. Removal of debris, residues and garbage from loose areas of bulldozers or discs

3. Check and ensure that the bulldozer slides and the top surface of the disc are clean.

4. Ensure that the safety signs are clean and in good condition. If damaged, lost or blurred, replace in time.

5. Clean the cockpit glass and check that all rearview mirrors are in place.

6. Before starting the grader, make sure that all the tools and other unfixed items on the machine are clear.

7. Visual inspection of brake fluid level through translucent main cylinder container. The liquid level should be at the flange of the container, not more than 1 inch from the top of the cap.

8. Check once a week or 50 hours of work. The daily pre-startup inspection method should also be used during the inspection.


Previous: Precautions for cement pavement construction: preparation before paving
Next: What if the drill pipe of rotary drilling rig drops slowly?

Back to list

News you are interested in
金溪县| 邵东县| 日照市| 微山县| 蓝山县| 孙吴县| 淅川县| 京山县| 永平县| 清镇市| 万源市| 云霄县| 苏尼特左旗| 拉萨市| 池州市| 美姑县| 和田县| 屯昌县| 彰武县| 瑞安市| 鞍山市| 尤溪县| 宁化县| 盐城市| 肥乡县| 清原| 保山市| 小金县| 台山市| 岱山县| 锡林浩特市| 岫岩| 即墨市| 肇源县| 延安市| 安义县| 康定县| 怀仁县| 微山县| 柯坪县| 宁陵县|